Where the Hours Go When an L&D Team Builds E-Learning In-House

professional-editor-uses-ai-powered-software-pc-reels-creative-office (1)

A ninety-minute film is the visible result of months of scheduling, rewrites, and reshoots, and none of that appears in the runtime.

A thirty-minute e-learning module is the same kind of artifact: the minutes a learner sees are a fraction of the hours that produced them.

In-house L&D teams carry a wide remit. They know the business, the audience, and the internal path to getting content approved, and they are often asked to produce quickly. A request for “a thirty-minute module” sounds like a contained task. 

The hours tell a different story, and many of them land in places the project plan never listed. This post maps where those hours go, so teams can plan capacity honestly and decide where a template, a different sequence, or an outside partner would protect their time.

Why One Finished Hour of E-Learning Represents So Many Hours of Work

Published estimates of development time per finished hour of e-learning vary widely. The Chapman Alliance’s 2010 survey of roughly 250 organizations reported ranges that begin at 49 hours for basic courses and reach 716 hours for the most advanced ones. 

ATD’s 2017 survey, How Long Does It Take to Develop One Hour of Training, sorted results by level of interactivity and compared them with earlier studies in 2003 and 2009.

A spread that wide tells you there is no universal ratio. It also comes with caveats. The Chapman data predates many current authoring tools, and ATD noted several factors it could not measure, including the experience of the respondents, whether teams were internal or external, the tools used, and how involved the client was. 

The useful takeaway is the pattern, not any single number.

What Drives the Spread

Research and practitioner guidance point to the same handful of factors as the main reasons development time differs from one project to the next:

  • Level of interactivity. Passive content, branching scenarios, and simulations sit at very different points on the scale.
  • Subject matter expert involvement. How available, how aligned, and how many experts contribute.
  • Media. Graphics, audio, video, and animation each add production work.
  • Assessment design. Self-checks take less time than realistic, scenario-based practice.
  • Scope and review. The number of stakeholders, the number of revision rounds, and whether the scope holds steady after sign-off.

The Hours That Rarely Make It Into the Project Plan

Authoring is the part of the work most people picture, and it is only one of several places the hours go. Here is the fuller picture:

  • Analysis and scoping. Confirming the performance need, the audience, and what success looks like before anything is drafted. Teams often do this informally, which means the hours go uncounted.
  • Subject matter expert coordination. Scheduling, interviews, clarifying questions, and waiting on answers.
  • Scripting and storyboarding. Turning source material into a sequence of learner decisions and activities.
  • Asset production. Graphics, narration, video, and scenario text.
  • Build and interaction. Authoring the screens, logic, and feedback.
  • Review cycles. Each stakeholder round, plus the work of reconciling feedback that conflicts.
  • Accessibility and quality assurance. Captions, keyboard and screen reader checks, device testing, and proofreading.
  • Publishing and tracking. Packaging for the LMS, testing SCORM or xAPI reporting, and troubleshooting.
  • Maintenance. Updates when a policy, product, or process changes after launch.
  • Project coordination. Status updates, scheduling, and keeping stakeholders aligned, which rarely has its own line in a plan.

None of these hours are wasted. They are the work. 

The issue is that a plan listing only storyboard, build, and launch leaves most of them to be absorbed by evenings, weekends, and other projects.

Where Hours Quietly Multiply

A handful of situations account for much of the gap between planned and actual effort.

The first is review. A module with two reviewers and one round of edits is a different project from one with six reviewers and three rounds, even though the content is identical. 

Conflicting feedback adds a layer of its own, because someone has to resolve it before the next edit can begin.

The second is expert availability. Waiting is not work, but it stretches the calendar and interrupts momentum, and each restart carries a cost in re-reading and re-orienting.

The third is scope that changes after the storyboard is approved. Content added late tends to trigger changes to the script, the assets, the build, and the review, all at once. 

A clear sign-off point, with a simple process for handling additions after it, protects the plan without limiting the team’s responsiveness.

A fourth factor is competing work. In-house teams rarely build one module at a time, and moving between projects, requests, and urgent updates carries its own cost in lost focus. 

Hours spent that way show up in no category, which is one more reason actual effort runs ahead of the plan.

How to Track Your Own Hours Before Planning the Next Build

Industry ratios are a starting point. Your own history is the most reliable estimate you have, because it reflects your tools, your stakeholders, and your review culture.

Track hours by the categories above across two or three projects, and note the level of interactivity for each. Within a few builds, you will have a ratio that reflects your team, and it makes a stronger case in a planning conversation than a published average. 

It also helps stakeholders understand why a request takes the time it does, since they can see how the hours divide across the work.

The categories can also point to where improvement is available. If tracking shows that review and expert coordination together take as many hours as the build itself, the opportunity is a leaner review process, not faster authoring. 

If analysis hours are consistently missing, that is a signal to name and protect them at the start of each project.

Protecting an In-House Team’s Time

Most organizations plan to keep building in-house. In Training magazine’s 2025 Industry Report, outsourcing averaged 7 percent of total training budgets, and 85 percent of organizations expected their level of outsourcing to stay the same in 2026. 

That suggests most teams intend to bring in support selectively rather than hand over their development.

Selective use is where small design and planning choices matter most:

  • Standardize what repeats. Templates, a style guide, and a shared asset library reduce the hours spent rebuilding the same elements.
  • Analyze before building. A short discovery step confirms whether e-learning is the right format at all, and prevents effort on modules a job aid could have handled.
  • Release in phases. Ship the most important content first, and refine while early data comes in.
  • Match format to need. Reserve scenario-based builds for the moments where practice changes behavior, and use lighter formats elsewhere.
  • Choose where partners fit. Surge capacity, specialized builds such as simulations, accessibility review, and xAPI measurement are common places where outside support protects the team’s time.

A practical way to decide is to sort the hours you tracked into two groups. Hours that depend on institutional knowledge, such as business context, audience insight, and internal approvals, belong with your team. 

Hours that depend on specialized production skill or added capacity, such as discovery facilitation, asset production, accessibility review, and packaging and testing for the LMS, are the ones a partner can take on without changing who owns the program.

The internal team’s knowledge of the business is the part no outside group can replicate quickly, which is a strong reason to keep it at the center of the work. Outside instructional design and development services can extend a team’s capacity around that knowledge instead of replacing it.

How Bubo Learning Design Works Alongside In-House L&D Teams

Bubo Learning Design works with L&D and HR teams who understand their business far better than any outside group could. We approach each engagement as an extension of that team, so its people can stay focused on the decisions only they can make while we support the work around them.

In practice, that support lines up with the places where hours tend to run over:

  • Analysis and scoping. Every engagement starts with discovery and learner analysis, so the work that often goes uncounted is planned and completed before production begins.
  • Review and scope control. A Design Document defines structure, scenarios, and measurement criteria up front. Milestone reviews from Alpha through Gold master then give stakeholders set points to weigh in, which keeps feedback organized and limits late additions.
  • Subject matter experts. Our instructional designers are practiced at working with specialists and translating complex, technical material into usable learning, so expert time goes toward accuracy and decisions.
  • Production and accessibility. Graphics, motion graphics, narration, and video come from one team, and 508 accessibility is built in from the start rather than added at the end.
  • Capacity and upkeep. Staffing, program management, and maintenance support can be scoped to the gap, whether that is a surge during a launch or steady help keeping content current.

That approach has supported role-specific programs for LinkedIn and Thomson Reuters, each shaped around what a particular group of learners needed to do on the job. 

For LinkedIn, the work included developing learning materials and providing technical support across more than 200 webinar sessions covering 25 topics, a scale at which a clear plan and defined review points matter.

Send us the project that is taking more hours than the plan allowed. We will walk through it with you, help sort out which hours belong with your team and where support would give time back, and recommend a starting point sized to the need, whether that is a focused discovery conversation, a single module, or added capacity alongside your team.

Leave a Reply

Your email address will not be published. Required fields are marked *